Contact Us  ‌  Search Site  ‌  Get E-News  ‌  Calendar

Home

Living

Working

Visiting

Business

Government

Public Safety

(Nav2)

DESIGN REVIEW

 

What projects are required to have Design Review?
New multi-family, commercial and industrial developments in Sumner are required to be reviewed per the City of Sumner Design and Development Guidelines and must go before the Design Commission.

 

Why is Design Review required?
Sumner is striving to maintain its small town character.  The Guidelines are intended to promote development that meets the goals and vision that is set forth in the Comprehensive Plan. Some of the key principles found in the Guidelines are bringing buildings closer to the street to promote pedestrian interest, locating parking to the side or rear of the buildings and to avoid large expanses of parking lot, and generally giving the area a friendly feeling that is not dominated by the automobile.

 

What is the process and who can I talk to about it?
Prior to submitting for a building permit, the project should be reviewed by the Design Commission. The Design Commission will hear and review the proposed projects at their monthly meetings and make recommendations to the Director of Community Development. The Director then makes a final written decision on the project. Conditions and changes recommended by the Design Commission are taken into consideration and often adopted as required conditions in the final decision.

 

How and when do I apply?
Application materials must be submitted three (3) weeks prior to the meeting, which is the second Thursday of every month, and must include 10 copies of each of the following:

  1. Scale drawings showing all sides of the building.

  2. Landscape Plan

  3. Site Plan (the landscape plan and site plan may be combined)

  4. Artist's rendition (optional)

How much does it cost?
There is no charge for design review.

 

How long does it take after the meeting to get a decision?
Following the meeting, staff prepares a final decision - usually within two weeks of the meeting.

 

Return to Land Use

 

CONTACT US
Community Development Department

Å 253-299-5520                              * cd@ci.sumner.wa.us

. 1104 Maple Street, Suite 250, Sumner WA 98390

FAX 253-299-5539
 

Living

Home & Property

Assessments

Land Use

Permits

Taxes

Tree City USA

Garbage Service

Recycling

Utilities

 

 Home | Living | Working | Visiting | Business | Government | Public Safety | Contact Us | Calendar
Privacy Policy
Copyright © 2006-2009   City of Sumner  1104 Maple Street, Sumner, WA 98390
webmaster@ci.sumner.wa.us