|
Sidewalk Permit Fee
(Ord No. 1417
Sect. XII)
including plan |
$20 |
|
Plus fee of
construction measured along curb lines: |
|
|
1 to 75 lineal feet
|
$5 |
|
75 to 110 lineal
feet |
$10 |
|
111 to 150 lineal
feet |
$12 |
|
Each additional 75
lineal feet or portion thereof |
$15 |
|
Each driveway or
curb opening |
$25 |
|
Replacement of low
curb & gutter,
(Ord No. 1417 Sect 11)
50 lineal feet or portion thereof |
$15 |
|
Anytime City crew places stakes for sidewalk,
(Ord
No. 1417 Section XI)
the fee for the permit shall increase 50% in
addition to the regular fee for this service. |
|
Utility permit fee (Ord
No. 1416 Section II) including gas, electric,
telephone, etc. or 1% of the
valuation, whichever is greater (Each
resubmittal of plans is 50% of the permit cost.) |
$50 |
|
Excavation in public
right-of-way (Administrative Fee - 12.28.030) |
|
|
1 to 75 lineal feet |
$10 |
|
75 to 100 lineal
feet |
0.10/ft |
|
Footage in excess of
100 lineal feet |
0.01/ft |
|
Hourly rate for
inspection |
$35 |
|
Hourly rate for plan
review (actual time) |
$45 |
|
|
|