Contact Us  ‌  Search Site  ‌  Get E-News  ‌  Calendar

Home

Living

Working

Visiting

Business

Government

Public Safety

 

PERMITS
Water Utility System Fees

 

Rate changes effective October 1, 2010 through October 1, 2011

 

The total fee for permit approval shall be the sum of the below elements.  An additional 25% shall be added to the total permit for applications outside the City limits for water system fees. (Ord. No. 1820)

 

Permit Base Fee:

Residential water service permit

$195.00

Commercial or industrial water service permit

$225.00

Fire hydrant

$195.00

Sprinkler system connection

$250.00

Cross connection control:

Residential irrigation system

All other systems

 

$125.00

$175.00

 

Inspection Fee:

2 hours x Current Inspector Burdened Rate (Minimum)

$113.63

Additional inspection as warranted: # hours x Staff Burdened Rate

 

(((Frontage Linear Feet/150) x 4) + 10) x Current Inspector Burdened Rate

 

Purity test

Initial Test

First retake/additional retake

 

$35.00

$35.00

 

Plan Review Fee:

1 hour x Current Engineer Burdened Rate (Minimum)

$67.04

In-house plan review fee + # hours x Current Engineer Burdened Rate

 

Third-party review fees as billed to City, including City administrative costs

 

 

**Burdened rate for City staff are actual salaries plus benefits with a 1.25 multiplier to cover costs.

 

Associate Engineer   $53.65

$67.04

Overtime $66.74

$83.43

Engineering Technician   $45.45

$56.81

Overtime $51.77

$64.71

 

System Development Charge - per equivalent residential unit (ERU):

 

1.  Single family dwelling and the first unit per building for multi-family

$3,680.00

2.  Every other unit per building in multi-family dwellings as ¾ of an ERU

 

3.  Each commercial or industrial establishment, per building:

 

Meter size in inches

3/4"

1"

1 1/2"

2"

3"

4"

6"

 

$3,680.00

$9,200.00

$18,400.00

$29,440.00

$55,200.00

$92,000.00

$184,000.00

4. Each industrial customer based on 3.50 Equivalent Residential Unit (ERU) per acre

$12880.00

 

Water meter only installation:

 

3/4"

$300.98

1"

$404.21

1.5"

$684.49

2"

$878.11

 

Water tap supplies and water meter shall be installed by the Public Works Dept.:

 

3/4"

$911.53

1"

$1,094.49

1.5"

$2,596.01

2"

$2,844.64

 

 

CONTACT US
Rebecca Coleman, Permit Specialist
Å 253-299-5530                         *  rebeccac@ci.sumner.wa.us

 

To schedule inspections, please call the 24-hour inspection line at
Å 253 299-5530

 

Living

Home & Property

Assessments

Land Use

Permits

Taxes

Tree City USA

Garbage Service

Recycling

Utilities

 

 Home | Living | Working | Visiting | Business | Government | Public Safety | Contact Us | Calendar
Privacy Policy
Copyright © 2006-2010   City of Sumner  1104 Maple Street, Sumner, WA 98390
webmaster@ci.sumner.wa.us